PHASE II · BUILD-TO-SUIT OPPORTUNITY

Verena Court Industrial

A 75,000 to 100,000 SF build-to-suit in Dubuque Industrial Center South, at the US-20 / Southwest Arterial interchange.

Phase II of a multiphase development. Phase I, a HODGE Material Handling facility, is under construction on the adjacent parcel, and the two share a truck court and dock apron. The site is graded and zoned, utilities are available, and the building is built to the user's specifications.

Verena Court Drone Shot
Site / Building

±5 acres • up to 100,000 SF build-to-suit

Status

Shovel-Ready, Graded, Zoned, Utilities Available

Delivery

12 To 18 Months

Site At a Glance

Built From the Inside Out

Site Readiness

  • Graded site within an active, master-planned industrial park.
  • All city utilities adjoin the property.
  • Zoning approved for industrial and warehousing use.

Site Infrastructure

  • Shared truck court and dock apron with Phase I facility.
  • Dedicated tenant parking sized to operational headcount.
  • Frontage on Seippel Road with full access via Verena Court.
  • Utilities in place: water, sanitary sewer, gas, electric, and fiber.

Building Envelope

  • Building footprint from 75,000 to approximately 100,000 SF.
  • Larger footprints use the shared truck court with Phase I; a standalone configuration supports the lower end of the range.
  • Final dimensions and specifications are designed to the user's requirements.

Built to Specification

  • As a build-to-suit, the building is designed around operational requirements.
  • Clear height, dock configuration, office buildout, power, fire protection, and climate systems are all specified to the operation, with no site constraints on building type or use.
Community Partners

A local developer, a community behind you.

Outfly is a Dubuque-based developer working directly with the city and its economic development partners.

Companies relocating or expanding here are supported by a community organized to help them land and grow — from site selection and workforce recruitment to training, financing connections, and the public resources that make a move successful.

Greater Dubuque DevelopmentThe City of Dubuque
Location & Highway Access

Built where the highways meet.

Verena Court Industrial sits at the most highway-accessible corner of Dubuque Industrial Center South. The 2020 completion of the Southwest Arterial, a six-mile, four-lane US-52 corridor connecting US-20 to US-61/151 created a full-interchange highway connection directly at Seippel Road.

Regional Drive Times

Quad Cities

~1 hour 10 minutes

Cedar Rapids

~1 hour 15 minutes

Madison, WI

~1 hour 45 minutes

Chicago

~3 hours

Twin Cities

~3 hours 45 minutes

From the Site

US-20 (4-lane):

Immediate access with continuous four-lane connection east to I-39 and the Chicago region

US-61/151:

Direct via Southwest Arterial, approximately 6 miles south, connecting to the Quad Cities and I-80

Dubuque Regional Airport:

Approximately 15 minutes via US-61